Ystrad Mynach Sewer Cleaning

Client: Ystrad Mynach Work Activity: UV Lining
Contract Value: £45k Date: July 2023

Due to flooding of nearby playing fields, Drainforce were tasked to establish siltation levels within 425m of large diameter bifurcation sewer upstream of a CSO.


Pre CCTV quickly verified that the sewer was drastically under capacity due to silt levels up to 75%. With the location of the sewer being through dense woodland, what would have been a routine job quickly escalated into a more complex operation. 


Read the full case study below:


DOWNLOAD PDF

DWR CYMRU WELSH WATER WITHYBUSH

Client: Welsh Water Work Activity: UV Lining
Contract Value: N/A Date: June 2023

Drainforce stop major pollution and disruption under a river, with a damaged sewer which was thought to be un-lineable.


Drainforce were tasked to complete structural liners on a pollution risk site of 174m of 225mm pipe, running close to and under a river.


The pipe in question had grade 5 structural defects running the entire length of the pipe.


Read the full case study below:


DOWNLOAD PDF

Foss Las Race Course Carmarthen

Client: Welsh Water Work Activity: UV Lining
Contract Value: N/A Date: 2023

Drainforce complete the longest UV Liner in the UK, at Foss Las Race Course Llanelli, curing 300m of 225mm pipe in one single length!


Drainforce were tasked to resolve infiltration gushing into the sewer system at Foss Las Race Course, Llanelli. The pipe in question was a 225mm clay pipe, approximately 570m long.


Through pre-site investigations and meetings, we highlighted all the manholes which had infiltration.


Read the full case study below:


DOWNLOAD PDF

EXCELSIOR ROAD, CARDIFF

Client: Dwr Cymru Welsh Water Work Activity: Jetty cleaning and robotic cutting
Location: Excelsior Road, Cardiff Date: October 2022

During cyclic desilting, Drainforce’s warthog jet had become buried outside of a 225mm pipe 2.5m deep, on a foul sewer outside a busy commercial and pedestrian area.


Drainforce used its robotic cutter to cut the jet hose free from the warthog.


Due to the depth of the pipe, Drainforce were tasked with installing patch repairs on the defective area.


During quality checks on site and on completion of a post survey, it was identified that the whole pipe (75m) was severely defective with continuous grade 5 defects along its full length.


 Click below to read the full case study.


DOWNLOAD PDF

Pen Y Wen Culvert Slip Lining

Case Study Number: Dyer and Butler Work Activity: Cleaning Jetting Confined Space Entry CCTV Slip Lining
Contract Value: £54,000.00 Date: 2022

Drainforce were tasked with slip lining a 550mm box culvert 8m deep under a Network Rail Railway Track.

The Culvert in question is 21m long had a full collapse at 17m.

Due to the collapse, it was not possible to get bursting Rods through the sewer and drilling was not an option.

Drainforce provide a solution with use of its Robotic Cutters feeding through a wire rope to allow SDR17 450mm pipe to be winched into position using a 10t winch.

Large invert slabs had fallen from the invert which would of wedged the pipe and stopped the pipe being winched into position.

Our Robot was used to drill into the slabs cutting them into smaller sections to allow our 32t recycler to jet out the debris so there was a clear and clean run to winch the pipe over.

The SDR pipe was fusion welded with a slip trench to feed the pipe into the culvert.

A 10t winch was positioned on the down stream section with Rollers drilled into position to allow the pipe to be pulled through.


Health & Safety

Drainforce had Zero incidents during the project.

Staff Competence
All of Drainforce Staff comply Network Rail standards and RISQS.

Quality Assurance
Drainforce are ISO 9001 and 14001 certified. We continuously monitor and improve our quality of services to this contract through the following points

Collaborative Working
Drainforce worked with the client successfully and the local community.

Plant and Equipment
Drainforce made use of it’s high powered recyclers that enabled suction from a far distance and their specialist raft system to CCTV the culvert.

All Equipment was less than 80dbs complying with Council noise regulations.

DOWNLOAD PDF

M4 ROAD CLOSURE FOR SWTRA

Client: SWTRA Work Activity: Gully and manhole cleaning
Location: M4, South West Wales Date: September 2022

Drainforce were tasked to clean over 2000 gullies and manholes on a full lane closure over 7m long between JN38 and JN42 of the M4. The road closure included all slip roads and all lanes.

 

Drainforce deployed 4 trucks to complete the works ranging from our bespoke 18t high volume Jetvacs with increased suction (1500cfm) to our state of the art recyclers. All work was completed on our bespoke mapping software with real-time updates.

 

DOWNLOAD PDF

First Use of the Video Nozzle

Case Study Number: 95752067  Work Activity: CCTV Survey to establish condition of 375mm diameter sewer pipe
Location: Heol Pandy, Llangeinor, Bridgend, CF32 8RA Date: July 2022

Drainforce were asked to complete a CCTV survey of a 450mm trunk sewer to identify any defects and possible root ingress downstream from a combined storm overflow.


The sewer lays beneath a high-speed road and is running at constantly 80% flow. To allow progression of the survey, complex traffic management measures were needed, and the flows needed to be stopped and over pumped.

Our innovative approach meant that the survey was completed quicker than expected with the desired result for our client.

DOWNLOAD PDF

DRAINAGE ASSET MANAGEMENT OF WELSH TRUNK ROADS

Client: Welsh Government Work Activity: Asset Management
Location: Wales Date: July 2022

The Welsh Government engaged with Drainforce Ltd to work with them to develop a system to collect and manage their drainage assets across their strategic road network.


Managing asset inventories, collecting asset conditions and have a centralised platform which has given them the ability to increase their understanding of assets to offer a better service to the public.

DOWNLOAD PDF

GULLY MAPPING

Client: South Wales Trunk Road Agent Work Activity: Gully Mapping
Location: Central Area and East Area Date: 29th October 2021

Drainforce have selected this as its identical Highway Drainage works on a different theme.


Drainforce are successfully completed a 24/hr 7 day per week exclusive reactive maintenance drainage contract for Neath and Port Talbot Council over the past year. delivering cost savings and innovation and efficiencies safely on site. We have also recently been successful in securing the East Section with the help and aid of our new Vehicles and mapping systems.

DOWNLOAD PDF

Syphon Removal with Robotic Cutting

Client: Welsh Water Work Activity: Syphon Removal with Robotic Cutting
Location: Cardiff Date: Aug 2021

Problem:

Removal of 100mm in-line Syphon and repair Syphon void.


Solution:

Drainforce have successfully completed their third trial of removing syphons with the use of robotic cutters. The process involves the use of robotic cutting techniques and patch repair technology. The concept was first trialled above ground in a mock situation whereas a 225mm syphon was cut and patch line repaired. 


Working with key clients we then progressed onto a live site and successfully removed a 150mm syphon and replaced with a 1m long patch repair. The third trial took place on the 24th of August where we were asked to remove an inline 100mm syphon at a depth of 2m beneath the boundary wall. The syphon was cut out and patch repaired in just six hours. 

DOWNLOAD PDF

Barkingside design & clean

Client: Dyer & Butler Work Activity: Design, Clean & CCTV Survey
Location: Barkingside Date: Dec 2020 - Mar 2021

Problem:

Defective pipe UTX drain and headwall that was becoming unstable along a LUL banking. The pipe in question was a Surface Water Pipe 900mm x 25m.


Solution:

We cleaned the culvert with recyclers which have a high volume of water ideal for removing large volumes of silt from the culverts and set up over-pumping and delivered the 5t liner to site though specialised track cranes.

DOWNLOAD PDF

CALDICOT MANHOLE COATING

Client: Alun Griffiths Contractors Work Activity: Manhole Coating & UV Lining
Location: Caldicot Date: April 2021

Problem:

We were engaged for this project based on relevant experience in flow-management and access maintenance.


Solution:

Drainforce completed complex overpumping enabling works to allow the flows to be managed and to facilitate the manhole coating sealing and lining of 71m of 375mm combined sewer.

DOWNLOAD PDF

CLAUDE ROAD UV LINING

Client: Vale of Glamorgan Council Work Activity: UV Lining and New Manhole
Location: Barry, South Wales Date: April 2021

Problem:

Sewer blockage and impaired access.


Solution:

UV lining, pre-start checks and CCTV surveying identified a defect that required excavation. The location of the defect was repaired by the installation of a new manhole, which also benefited the project providing access into the culvert to complete the UV lining installation.

DOWNLOAD PDF

BLUESTONE UV LINING

Client: Bluestone Resort Work Activity: UV Lining
Location: Pembrokeshire Date: Feb 2021

Problem:

Drainforce were engaged to resolve a problem with the foul system for the Bluestone Resort, West Wales. The system was overloading and therefore, non-compliant.


Solution:

Our approach was to reduce the system infiltration through a mix of UV Lining and MH Sealing; using lining though MHs where infiltration was gushing and to divert connections to other manholes.


This meant we could line though specific manholes with a high level of infiltration ensuring they were fully sealed, and resolving the issue.

DOWNLOAD PDF

URGENT PUBLIC SEWER REPAIR, PONTYPRIDD

Client: Lewis Civil Engineering Work Activity: No-Dig Repair
Location: Pontshnorton Road, Pontypridd Date: 2020

Problem:

Drainforce were engaged to investigate and develop a non-dig repair solution on an historical problematic sewer on sump in a combined sewer. 

Solution:

An initial spot repair was completed where the sewer had collapsed, the excavation was adjacent to two high pressure water mains and a high-pressure gas main, and the main valleys feed for HV electricity and Fibre optic line.


A plan of multiple overpumping of the sewer was set up, initially CCTV identified that 6 felt patches were put in place by another supplier were defective. We removed the defective patches by robotic cutting.

DOWNLOAD PDF

EASTERN VALLEY TRUNK SEWER FLOOD

Client: DCWW Work Activity: Investigate and clear blockage
Location: Pontypool, South Wales Date: Dec 2020

Problem:

A 700mm diameter trunk sewer was found to be discharging and causing serious flooding to a local business yard and premises.


Solution:

First step was to deploy our 32t Dirty Water Recycler to attempt the jetting and removal of any obstructions. There was an obstruction that we were unable to move, so a visual inspection was required.

Due to the huge flows present within the sewer, CCTV was not possible without over pumping. This was achieved with the use of two large diesel pumps and over 250m of delivery pipe.To remove the roots and the debris we utilised our robotic cutting rig to cut away the roots and debris thus allowing us to jet out the wheel and clear the blockage.

DOWNLOAD PDF

NEWPORT FLOODING

Client: Newport County Council Work Activity: Root Cutting and UV Lining
Location: Pencarn Way, Newport Date: Jan 2021

Problem:

Drainforce were commissioned by Newport Council to investigate and rehabilitate a section of Gravity Surface water drainage runs at Pencarn Way, Newport. The area had a historical issue with ponding water and flooding. We completed pre CCTV investigations identifying roots and debris in the sewer and obstructions in the lateral drains from the gully’s running into the carrier pipe which was the main issue of the flooding in the area.

Solution:

We used high-volume jet-vacs to clean the area, then used robotic cutting to clear roots and obstructions. Excavation was required to expose the pipe due a defect, then we were able to re-line the pipe.

DOWNLOAD PDF

Vale of Glamorgan Council 

Client: Vale of Glamorgan Work Activity: UV Lining
Location: Brookfield Avenue Date: Nov 2020

Problem:

Drainforce Ltd have just successfully completed a major UV lining rehabilitation project on a major Surface Water Culvert in Barry. (1250mm) The culvert was initially blocked causing flooding issues and had a sewer running through the crown, causing several structural issues. The line was also 30% full of concrete.

Solution:

Drainforce deployed their Recyclers, Robotic Cutters and UV lining Rig to rehabilitate the Culvert following an agreed design.

DOWNLOAD PDF

Colwinston UV Lining and Shingle Blowing

Client: Vale of Glamorgan Council Work Activity: UV Lining and Shingle Blowing
Location: Colwinston Date: Sept 2020
As part of Drainforce's lining Framework with the Vale of Glamorgan Council a no dig solution was found to rehabilitate a problematic aged surface water drainage system with the least disruption to customers.
The Line in question was a 54m Gravity Surface Water Line. Pre CCTV Identified structural defects throughout the line. 
Download the full report below:
DOWNLOAD PDF

GLANNANT

Client: Alun Griffiths Work Activity: Super Flex 3 in lining
Location: Glannant Date: Aug 2020
Problem:
Drainforce were tasked with rectifying defective pipes over a river crossing that was leaking sewage. This was potentially hazardous for the public and our team.
Solution:
After investigation it was decided the best option would be to line the crossing to avoid any disruption to customers and increase the safety of the works due to the location of the crossing. Using specialist chain frail to remove incrustation, a Super Flex 3-inch liner was inserted and extended out to the manholes. The system was back to full operation within the day with no disruption to the public.
DOWNLOAD PDF

PUBLIC SEWER URGENT REPAIR AND REHABILITATION

Client: Alun Griffiths Work Activity: Public Sewer Repair & Rehabilitation
Location: Hereford Date: Aug 2020
Problem:
Drainforce were tasked to rectify a defective public sewer that had caused internal flooding and a pollution incident. It was in a very busy area which required road closures, diversions and a secure working zone to keep the public safe.
Solution:
After completing the required risk, health and safety assessments in conjunction with the highways authority, we had to secure the zone. Followed by excavation, over-pumping, pipe cleaning and UV lining. The completed works were finished with a post-work survey and relevant actions to get the road back into operation. We're pleased to say the work was finished ahead of time and within budget.
DOWNLOAD PDF

BRITON FERRY CULVERT CLEANING

Client: Dyer & Butler Work Activity: Culvert Cleaning Under National Rail Tracks
Location: Briton Ferry Date: July 2020
Problem:
Drainforce were tasked with cleaning a 2m culvert over 40m long which was fully 50% full of silt. The culvert shown in the above diagram ran directly under Network Rail Tracks.

Solution:
Set up dams to increase water levels so the system could be pumped an access gained from both sides. This allowed our recyclers access. Over 8 tonnes per day were removed with our Kaiser Whale recyclers and all waste was disposed of in our Welsh Assembly funded recycling bay which resulted in zero waste to land fill. Download the full report below:
DOWNLOAD PDF

CULVERT CUTTING 

Client: Dyer & Butler Work Activity: Culvert Cutting on National Rail tracks
Location: Llanelli Date: March 2020
Problem:
Drainforce were tasked with cleaning a 1.2m culvert over 40m long.The culvert ran directly under Network Rail tracks and was completely blocked with silt and debris. The inlet and outlet of the culvert needed to be excavated by hand before cleaning works could commence.

Solution:
Drainforce used fully qualified PTS Rail staff and state of the art recyclers to clean the culvert. Portable pumps were used to manage the flows and specialist dam systems set up to isolate the culvert from further flows upstream. Once the culvert was cleaned, a post structural survey was completed using our specialised raft system. Download the full report below:
DOWNLOAD PDF

DEBDEN UV LINING

Client: Integrated Track Team Work Activity: UV Lining
Location: Debden Date: Feb 2020
Problem:
Drainforce were tasked to UV line defective pipes on various gravity drains under London Underground Tracks at Debden Station.

Solution:
The solution to achieve this was to clean the lines with pressures of 2000psi and 110g/min, identify the obstruction, then remove the obstruction through a mix of recyclers with special jet heads and our robotic cutter and then to UV line the drainage runs with a Saertex UV liner.
DOWNLOAD PDF

LLANWERN PILE CUTTING FEASIBILITY

Client: Lewis Engineering Work Activity: Pile cutting feasibility
Location: Newport Date: Feb 2020
Drainforce were approached by a client to look at options to cut out a steel pile that has been driven through a large diameter brick sewer which is also located adjacent to the Swansea to Paddington Railway line.The estimated cost for dig down repair solution is in excess of £1.5m. Download the full report below:
DOWNLOAD PDF

WESTGATE STREET PROJECT

Client: Alun Griffiths Work Activity: Pipe Rehabilitation
Location: Cardiff Date: Oct 2019
Problem:
Surface depression appeared on a busy bus route in Cardiff centre, investigations carried out identified a large diameter 890mm diameter brick sewer had started to collapse. A solution was developed to minimise disruption, a quicker completion of the job and reduced excavation. This was vital given the volume of other utility services working underground in the same area.

Solution:
The solution to achieve this was to excavate the deformed section of brick sewer, then install a UV liner. You can view the process we followed below:
DOWNLOAD PDF

GULLY MAPPING

Client: South Wales Trunk Road Agent Work Activity: Gully Mapping
Location: Central Area and East Area Date: 2017-Date

Drainforce have selected this as its identical Highway Drainage works on a different theme.


Drainforce are successfully completing a 24/hr 7 day per week exclusive reactive maintenance Drainage contract for Neath and Port Talbot Council over the past year delivering cost savings and innovation and efficiencies safely on site. We have also recently been successful in securing the East Section with the help and aid of our new Vehicles and mapping systems.


Click below to read more.

DOWNLOAD PDF

24/7 365 Response

Average response times of 1 hour with local engineers up and down the country

State-of-the-Art Technology

We invest in technology to ensure we're using the latest and best technology to minimise disruption and achieve fast results

Expert Engineers

Fully qualified, experienced and CRB vetted engineers

Competitive Pricing

Trusted and competitive quotes with no hidden costs